Document 21
Ground floor plan of Krematorium II [PMO neg. no. 20957]
|
|
| |
|
|
| |
Bauleitung drawing
933 of 19th January 1942 drawn by SS sergeant Ulmer on 19/1/42 checked
by SS Second Lieutenant Dejaco and approved by SS Captain Bischoff on
28/1/42 Entwurf für das Krematorium / projected
crematorium
This drawing is part of drawing 933[1]. Comprising
933 (ground floor) and 934 (sections).
[At that date it was planned to
install a new normal crematorium in the main camp, behind
Krematorium I. It was not until the end of August 1942 that, now classified as
worksite BW 30, Krematorium II, work began on it at Birkenau, where a mirror
image was also to be built: BW 30a, Kr.III] |
|
|